• Home
  • About
    • Contact
    • COF Vision Statement
    • Leaders
    • By-Laws
    • State of Ohio Certificate
      • Articles of Incorporation
    • Upcoming Events
  • Repeal SB221
    • Why help repeal Ohio SB221 campaign?
    • Ohio’s Energy Nightmare!
    • What is Ohio Senate Bill 221?
    • Global Warming
      • Global Warming Myth or Reality?
      • Climategate emails
    • The True Cost of Wind Energy
    • Energy Sustainability
    • Energy Independence – A Congressional Primer
    • Oppose Kasich’s Severance Tax on the Natural Gas Industry
  • National Issues
    • Navy Bio-Fuels Program
    • Really?!
    • LEEDs and Agenda 21
  • What is Thorium Energy?
    • Thorium and LFTR Top Ten Attributes
    • A World Wide Energy Solution America Can Supply
    • Can Thorium End Our Energy Crisis?
    • The Thorium Dream
  • Resources
    • Political Resources
    • Presentations
    • Promotional Flyer
    • Podcasts
      • Kirk Sorensen
      • Dr. Robert Hargraves
      • Dr. Bill Thesling
      • Ken Kay

Kvaerner Wins Jacket EPSC Gig at Hild Field

facebook
twitter
13 Feb 2012
Jon


  • Digg It

  • Stumble it!

  • Newsvine

  • Del.icio.us

  • Technorati

  • Reddit

  • Facebook

Total EP Norge AS has awarded Kvaerner an EPSC-contract (Engineering, Procurement, Supply and Construction) of close to $200 million (NOK 1.2 billion) for delivery of a steel jacket to be located at the Hild Field offshore the Norwegian North Sea.

“We are very pleased to have won our second jacket this year in tough international competition. This is in line with our strategy, and demonstrates our strong position in the jacket EPC market,” said Nina Udnes Tronstad, Executive Vice President in Kvaerner responsible for the jacket business.

The contract will be executed by Kvaerner’s yard in Verdal, and includes engineering, procurement, supply, construction, load-out and sea-fastening of the jacket and associated piles. The jacket (16 500 tonnes) and piles will have a total weight of approximately 21 400 tonnes.

Detailed engineering starts immediately, while fabrication in Verdal will commence in fourth quarter 2012. The project will reach its peak manpower of more than 400 persons in third quarter 2013. The Hild jacket will be delivered in the spring of 2014, and becomes number 42 in the series of jackets delivered by Kvaerner since 1975.

Kvaerner’s yard in Verdal is one of the few yards in Europe specializing in EPC jacket deliveries, with altogether five oil and gas jackets currently in execution for ConocoPhillips in Norway, BP in UK and and the recently awarded Luno jacket for Lundin Norway AS, in addition to 49 jackets for the offshore wind farm project Nordsee Ost for RWE Innogy in Germany.

About the Author

Social Share

  • google-share

You must log in to post a comment.

Recent News

  • Carbon Taxation: Just Say No (NAM letter represents a broad business front)
  • ‘Deep Ecology’ versus Energy (McKibben’s virus understood)
  • “Dirty, Dangerous, and Run Amok:” The Sierra Club’s War on Gas in their Own Words
  • Draft National Assessment on Climate Change: Politicization of the Scientific Method ("1,200 horror-studded pages … of pseudoscience")
  • “Peak Oil Is Dead”: M. A. Adelman Revisited
  • The Imperishable Permian Basin: Growing at 90 (Resourceship in action: I)
  • Wind Performing Badly
  • The ‘New’ Confusion About Planning: T. Boone Pickens and Energy Public Policy
  • Pickens Plan III: More Retreat but Still Errant (SPR oil for nat gas)
  • AWED Energy & Environmental Newsletter: May 13, 2013

Search the Site